Concerns over plan to dump silt in gulf

CONCERNS have been raised about a plan to dump silt dredged from Port Adelaide into Gulf St Vincent.

Flinders Ports has applied to dredge 1.55 million cubic metres of material to widen the channel at Outer Harbor by 40 metres, allowing bigger ships to pass through.

However, numerous groups have issues about dumping the waste product into the gulf.

To view full articles in the CURRENT issue click HERE and follow the prompts to subscribe to YPCT-E.
For all previous issues please contact our office on 8821 1155.

Leave a comment

Make sure you enter all the required information, indicated by an asterisk (*). HTML code is not allowed.

Kadina Jewellers
Kadina Travel
Bridgestone Tyre Centre
Larwoods
Copper Coast Auto Electrical
Royal Exchange Hotel
YP Community Transport
Optom All Vision Care
SYP Motors
Copper Coast Hotel
Crowell Concrete
Spiderman YP
Wallaroo Pizza and Pasta
Maitland Marine Services
Loctite Self Storage
Copper Coast Garage Doors
Ziersch Cabinetmakers
Maitland Foodland
Saltwater Cafe
Metal As Anything
Remsco
Desmond's Meat Service
Coast Road Motors
Moonta Newsagency
Sails
Star Of The Sea
Minlaton Engineering
Kadina Heating
JD Southwood
Peninsula Plumbing
YP Marine
Yorke Valley Hotel
Protea Auto
Kadina Hotel
Sportspower